- Scope
- Safety Precautions
- Risk Assessment
- Work Permit Requirements
- Operational Clearance
- Control room Workstation Healthiness Check Procedure
- Post-Maintenance Checks
- Documentation & Reporting
- Preventive Maintenance Schedule for Work Station
- Control Room Workstation Maintenance Excel Checklist – Download
- Frequently Asked Questions (FAQ) – Control Room Consoles & Equipment
- What is a Control Room Console?
- What is the purpose of a Control Room?
- What equipment is used in a Control Room?
- What is the Human Interface?
This maintenance process verifies the optimal functioning and health status of DCS (Distributed Control Systems) and PLC (Programmable Logic Controller) HMI (Human-Machine Interface) system workstations in control rooms. System reliability and performance along with smooth operation and minimized failures result from regular maintenance which extends the lifespan of HIS (Human Interface Stations).
Scope
The procedure establishes standards for the entire set of workstations present inside control rooms.
- The industrial process monitoring and control runs through DCS and PLC HMI systems.
- The maintenance activities involve both engineering stations and servers which help professionals with diagnostics and troubleshooting.
- Operator consoles and interface stations for system operations.
Safety Precautions
General Safety Guidelines
- Workplace safety measures should always be implemented before starting any maintenance initiative.
- Procedures for Lockout/Tagout (LOTO) should be followed to disconnect power before or the start of hardware maintenance if necessary.
- Electronic components need protection from damage using Electrostatic Discharge protection elements like wrist straps combined with antistatic mats.
- Every maintenance activity requires complete backup of critical data and configuration information.
- The workstation needs to remain clean with all obstructions removed in order to stop equipment overheating and protect against dust accumulation.
Personal Protective Equipment (PPE)
Every maintenance operation demands specific Personal Protective Equipment that must be used accordingly.
- Every sensitive electronic device requires antistatic gloves to keep them safe.
- The use of safety glasses is mandatory during the cleaning process and compressed air work activities.
- To protect against surface dust exposure one should wear a mask during cleaning operations.
Risk Assessment
Hazard | Risk | Mitigation Measures |
Electrical Shock | Medium | Ensure power isolation before servicing. Use insulated tools. |
Data Loss | High | Perform data backup before making system changes. Create a full system image backup of the workstation before performing major updates or changes.Store the backup on a secure external drive or network location for quick restoration if needed. |
Hardware Damage | High | Correct equipment handling protocols along with ESD protection systems must be used. |
Overheating | Medium | To prevent overheating facilities should maintain their ventilation and cooling systems effectively. |
Unauthorized Access | High | Workstations need protected security systems and users must authenticate their access.. |
Work Permit Requirements
Types of Work Permits Required
- The necessary requirement for installing or servicing electrical systems includes obtaining an Electrical Work Permit in order to perform power isolation and servicing.
- The organization needs to obtain Hot Work Permits when workers undertake soldering or utilize any equipment that produces heat as part of their maintenance duties.
Work Permit Issuance Process
- A Risk Assessment must be performed to determine any potential hazards along with required safety precautions.
- Please inform Operations Team members about upcoming maintenance operations.
- Obtain Work Permit Permission then complete safety protocols according to protocol.
Operational Clearance
Control room Workstation Healthiness Check Procedure

Workstation Identification & Initial Preparation
- The technician must collect the work permit before starting maintenance of the workstation.
- You need to identify the Human Interface Station (HIS) tag name through the label positions on both sides of the workstation console or system documentation.
System Login & Performance Check
- Use the Administrator user account to login into the workstation.
- Drive memory availability should be checked through the “My Computer” icon followed by noting the storage information. A computer system with inadequate memory tends to produce performance slowdowns and overall sluggish behavior.
- To check the status of antivirus protection simply move your mouse cursor to the antivirus icon located on the taskbar. Users can perform updates by installing the newest version through either a CD or connected network resources.
- Use your right mouse click and open Task Manager by selecting its “Start Task Manager” option. Under the Performance tab users should inspect the system’s CPU and RAM utilization levels. Operational use of the system must remain within parameters established in the plant system philosophy. The system performance could have bottlenecks when CPU or memory usage exceeds standard limits.
Hardware & Power Supply Inspection
- You should check that the cooling fans inside the workstation console operate correctly. System failure together with overheating occurs when fans fail to function correctly.
- Check the utility supply voltage using a multimeter at the MCB (Miniature Circuit Breaker) installed on the rear of the workstation console. Check that the operating voltage remains within its specified supply boundaries.
Peripheral & Workstation Condition Check
- Check the functionality of all hardware components which include mouse, keyboard and monitor. The user must clean peripherals by removing dust along with debris which can disrupt their operation.
- The system will operate better after users delete unnecessary data files to make additional storage space available.
BIOS/UEFI Firmware Check
- Verify that the workstation’s BIOS/UEFI firmware is up to date.
- Check for any pending firmware updates from the manufacturer.
- Ensure that BIOS/UEFI settings (e.g., boot order, power management) are configured correctly for optimal performance.
Display Configuration
- Inspect the graphics card for proper seating and cooling.
- Verify that the display resolution and refresh rate are set correctly for the monitors.
- Check for driver updates for the graphics card and ensure compatibility with the DCS/PLC HMI software.
USB and Serial Port Functionality
- Test all USB and serial ports for proper functionality.
- Ensure that peripherals (e.g., keyboards, mice, external drives) are recognized and functioning correctly.
- Clean ports to remove dust or debris that may affect connectivity.
Operating System Optimization
- Disable unnecessary startup programs and services to improve boot time and system performance.
- Defragment hard drives (if using HDDs) or optimize SSDs using built-in tools.
- Clear temporary files and system caches to free up storage space.
Network & Communication Health Check
- The Ethernet ports located at the back of the workstation need examination to verify network availability. The LED indicators will blink to verify connection status with the network.
- Verify that the Network Interface Card (NIC) is functioning correctly and is configured with the correct IP address, subnet mask, and gateway.
- Check for driver updates for the NIC.
- Test network throughput to ensure there are no bottlenecks or packet loss.
Real-Time Clock (RTC) and Time Synchronization
- Verify that the workstation’s Real-Time Clock (RTC) is accurate.
- Ensure that the workstation is synchronized with the control room’s time server (e.g., using NTP).
- Check for any time drift issues that could affect system logs or time-sensitive operations.
Event Logs and System Diagnostics
- Review system event logs (e.g., Windows Event Viewer or Linux syslog) for any errors or warnings.
- Use diagnostic tools to identify and resolve hardware or software issues.
- Document any anomalies and take corrective actions.
Software License Validation
- Verify that all software licenses (e.g., operating system, DCS/PLC software) are valid and up to date.
- Renew licenses as needed to avoid service interruptions.
Peripheral Firmware Updates
- Check for firmware updates for peripherals such as monitors, keyboards, and mice.
- Apply updates to ensure compatibility and optimal performance.
Operator Account Verification
- Use the Operator account credentials to log in to the system to confirm regular functionality after Administrator account exit.
Workstation Panel & Cabling Inspection
- Assess the seal integrity of spare cable entry holes in the panel since this protects against external contaminants.
- Examine all electrical connections within the workstation panel before tightening them if they appear loose.
Workstation Cleaning & Cable Management
- Vacuum cleaners should be used on workstation panel air filters to cleanse accumulated dust deposits. It is necessary to refrain from using compressed air in sensitive compartments.
- All cables need proper dressing with duct covers installed to protect from damage while maintaining organized cable arrangement.
- Inspect all cables (e.g., power, network, video) for signs of wear, fraying, or damage.
- Replace any damaged cables to prevent connectivity issues or electrical hazards.
- Ensure that all connectors are securely attached and free from corrosion.
Refer the below link for the Comprehensive PLC Panel Installation and Commissioning Checklist (Downloadable)
Post-Maintenance Checks
System Restart & Verification
- After restarting the workstation users should check that all programs start without issues.
- Check that DCS/PLC network is active with real-time information showing correctly on display screens.
- System errors and alarms need examination following a system restart.
Final Clearance from Operations
- Notify the Control Room Operator about the finished maintenance work.
- The handover becomes possible only after a full operational verification demonstrates system readiness.
- Close all work permits once final verification passes.
Documentation & Reporting
Record maintenance details, including:
- Workstation tag name and ID.
- Date and time of maintenance.
- Issues identified and corrective actions taken.
- Components replaced, if any.
- Personnel involved in maintenance.
The report should be submitted to the engineering and operations teams for their records while preserving future reference capabilities.
Preventive Maintenance Schedule for Work Station
This Workstation Maintenance Check Procedure helps control room workstations operate with efficiency and reliability and security to extend the operational lifetime of DCS and PLC HMI systems. System stability together with operational performance improves through routine maintenance practices.
- Staff members should check basic performance and health of systems daily.
- The procedure calls for antivirus update verification as well as log file examination on a weekly basis.
- Staff should inspect workstation cooling as well as UPS status and storage health during their monthly checks.
- The maintenance protocol includes deep system cleanups and software update installation together with assessment of performance metrics once per quarter.
Control Room Workstation Maintenance Excel Checklist – Download
This checklist ensures comprehensive maintenance of control room workstations, enhancing safety, performance, and reliability while minimizing downtime and failures.

Refer the below Download Link for Excel form Checklist
You can download more checklist by Click on 50+Collection of Essential Instrumentation and Automation Control System Checklists
Frequently Asked Questions (FAQ) – Control Room Consoles & Equipment
What is a Control Room Console?
The Control Room Console functions as specialized furniture that enhances working comfort while reducing distractions for personnel operating in critical command centers. These consoles work as functional monitor and control stations that enable full operational management of command center operations and industrial procedures.
What is the purpose of a Control Room?
Control Rooms serve as operational centers which allow personnel to oversee and direct the operation of production or infrastructure and service functions in facilities. Real-time data oversight combined with alarm management and informed decision functions are possible through this system.
What equipment is used in a Control Room?
A control room contains a number of essential features that include:
- The control room workstations known as control room consoles use ergonomic features to support extended periods of observation.
- Proper visualization technology includes large display walls and dashboards along with monitors to monitor real-time data.
- Control rooms benefit from optimized lighting and soundproofing features which maximize operator performance.
- For critical system operations a power distribution system needs to exist to provide steady power without interruptions.
- The arrangement of furniture along with placement of objects takes a purposeful approach which helps employees follow their workflow while decreasing fatigue symptoms.
What is the Human Interface?
Human Interface stands as any device or platform which facilitates technological communication with human users.
At work sites and industrial facilities these elements play an important role:
- Touchscreens present operators the ability to access systems through visual interfaces.
- Physical or digital control panels serve to allow observation and management of various operational processes.
The interfaces serve as fundamental components for maintaining smooth communication links between operators and their automated systems.