Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6121
Sinking and Sourcing: Which Connection is Best for Your PLC?

Sinking and Sourcing: Which Connection is Best for Your PLC?

In industrial automation and control systems, Programmable Logic Controllers (PLCs) play a significant role in the control and monitoring of operations.  An important component of PLC hardware design includes how inputs and outputs are coupled, specifically the sinking and sourcing methods.  Both phrases refer to the way the device handles current and interacts with other … Continue reading Sinking and Sourcing: Which Connection is Best for Your PLC?